Sydney, NSW
Water Recycling Plant
Dredging & Dewatering
Situation:
Sydney Water engaged our company to undertake a maintenance project on the oxidation pond at this Water Recycling Plant. The client requested all sludge sediment to be removed from the pond. During the project, the pond was required to remain in operation, with possible water level changes up to 1.1m.
Our Approach:
We removed 53,000 m³ of material from the pond with Dredging Solutions' Rotomite 6000 auger suction dredge. The sludge was subsequently dewatered via geotextile dewatering containers and retained onsite for further consolidation.
Result:
The oxidation pond was completely desludged with no interruption to daily operations. Once the dewatered sludge cake within the dewatering tubes was confirmed to have a solids content of greater than 20% solids wt/wt, it was taken to a licensed facility organised by the client.