top of page
Lytton Oil Refinery Filtration Pond Dredging
November, 2017
Situation:
The filtration pond at Lytton Oil Refinery was reaching its full capacity. Following the previous engagement in 2016, Dredging Solutiosn was again contracted to remove the in-situ sludge from the pond.
Our Approach:
Utilising the manned Rotomite 6000 auger suction dredge and associated discharge pipes, Dredging Solutions removed in-situ materials contained within the nominated pond. The dewatered materials were then transported to a nearby waste management facility for energy recovery.
Result:
The filtration pond was desludged to the client's operation requirements.
bottom of page